Search

1 Tower Bridge

Various Scaffolds for Access, Loading and Public Protection

The Brief

The One Tower Bridge site is one of the most high-profile in Central London and is located overlooking Tower Bridge, right on the bank of the River Thames and adjacent to the offices of the Mayor of London.

48.3 were involved with the TRAD contract team right from the very beginning of the project, planning the scaffolding and working with various trades to produce a design that facilitated safe means of access for everyone – this was itself, the biggest challenge we faced.

1 Tower Bridge - Various Scaffolds for Access, Loading and Public Protection

The Work

An innovative approach to material use, tie methods, bracing sequencing and platform formation and adaption combined to create a really fantastic end solution for main contractor Berkeley, who, along with their sub-contractors, were able to complete all their works from a single scaffold: concrete finish, cladding brackets and cladding install, balcony install, brickwork and curtain walling and glazing.

The Result

In addition to access scaffolding TRAD provided and 48.3 designed a beamed pavement gantry along the length of Tower Bridge Road with various bridges and cantilever sections, hoist run-off’s and staggered loading bays, staircases and back-propping.

1 Tower Bridge - Various Scaffolds for Access, Loading and Public Protection
Privacy

48.3 Scaffold Design processes data to provide:

An enhanced website experience, geolocation and search activity data for marketing purposes, personalised ads and content, ad and content measurement, audience insights and product development. To facilitate this, we actively scan device characteristics for identification and store and/or access information on a device. For more information, please refer to our cookie policy or contact info@483.co.uk